Buying Land & Rural Property · St. Mary's County, MD

A parcel marketed as “buildable” may still need current septic evidence, land-use review, a surveyed site plan and several separate approvals. In St. Mary’s County, the Health Department evaluates on-site sewage disposal suitability, while County land-use officials address zoning and development applications. A perc result is one piece of evidence about soil and groundwater conditions; it does not, by itself, authorize a house, subdivision or well. Before you waive a due-diligence contingency or treat a vacant lot as ready for construction, match the records to the exact parcel and the home you intend to build.

A perc result is a starting point

Ask what was tested, when, for which parcel and proposed use, and whether the Health Department considers the records usable for the present application. Confirm zoning, access, well feasibility and site constraints separately.

1. What a Perc Test Can and Cannot Tell You

A perc test is part of evaluating whether soils and site conditions may support an on-site sewage disposal system. The St. Mary’s County Health Department (SMCHD) reviews applications and site information for properties that need septic service. Its current perc-testing instructions describe a process that includes an application, site review and, when a suitable area is identified, submission and review of a surveyed plat. Follow the current form and instructions; procedures and fees may change.

A favorable test or identified suitable area is not the same as a building permit, subdivision approval, approved house plan, well permit, septic construction permit or guarantee that every proposed bedroom count will be served. The Health Department’s decision concerns onsite sewage requirements. St. Mary’s County Land Use and Growth Management (LUGM) handles zoning and land-development review; other agencies and licensed professionals may have separate roles. Treat each conclusion as limited to its subject, scope and date.

2. Get the Parcel Identity and Existing Records Before You Offer

Start with the tax account number, deed description, recorded plat and any prior perc-test reports, septic permits, as-built drawings or correspondence with SMCHD. Compare each document to the property being sold. A neighboring lot, former parcel, proposed subdivision or different parcel number can make old records irrelevant. Ask the seller for complete records and written permission for the agencies or professionals to discuss them with you.

Request the date and purpose of any testing, the location of test pits, the bedroom count or design assumptions, the system type, and any conditions or expiration stated in the correspondence. Ask SMCHD whether the records are in its file and whether they can support a current application for your intended use. A seller’s statement, old approval letter or listing remark is useful to investigate, but should not replace confirmation from the agency responsible for the current review.

A practical first-pass checklist

  • Confirm the exact tax account, deed, recorded plat and current survey.
  • Ask SMCHD whether prior perc records apply to this parcel and intended bedroom count.
  • Confirm current application, documentation, access and fee requirements directly with SMCHD.
  • Ask LUGM about zoning, permitted use, subdivision status and development rights.
  • Put agency review, access and contract deadlines in writing with your attorney.
Source: St. Mary’s County Health Department perc-testing instructions; Maryland onsite sewage regulations; St. Mary’s County LUGM. Nicole Gantt · The Riley Team at Deep Roots Real Estate · nicolegantt.com

3. Confirm Today’s Application and Site-Plan Process

Use the latest SMCHD application rather than an old form copied from a prior owner. The Health Department’s perc-testing page lists current directions and forms. It explains that acceptable sites require a surveyed plat for review. Ask the department what documents, owner authorization, site markings, access arrangements and application fees apply to your case. Do not rely on a fee quoted in an old listing or on another property’s application; the process and fee schedule can be revised.

The testing area should be planned in relation to the full property. A proposed house, well, driveway, grading, drainage, reserve area and septic system can compete for limited space and must satisfy applicable separations and design rules. Have a Maryland-registered land surveyor prepare or update a plan when required, and ask SMCHD how the site should be marked before field work. Don’t clear, fill, excavate or place equipment in a proposed area without confirming the department’s instructions and any other permit requirements.

4. Check the Whole Lot Layout, Including the Well

A parcel can have enough area on paper but lack a workable arrangement for the home, well and septic components. Ask the Health Department how a proposed well and sewage area are evaluated together and what information a current plat must show. Maryland’s onsite sewage regulations in COMAR 26.04.02 set statewide requirements; SMCHD applies the relevant rules to the local application. A well driller and qualified site professional can answer technical questions about the proposed location and construction.

Also identify wetlands, streams, floodplain, steep slopes, forest, easements, setbacks and existing structures. Those constraints may affect the available design area even if a septic area is acceptable. County GIS and state maps are screening resources, not a boundary survey or agency determination. For a waterfront or constrained parcel, ask LUGM and the responsible environmental agency which reviews apply. A surveyor, engineer, soil professional or environmental consultant may be needed depending on the property; select licensed professionals for the scope they are qualified to perform.

5. Match the Evidence to the Home You Plan to Build

Sewage-system design and approval depend on the proposed use and applicable requirements. Tell SMCHD the realistic number of bedrooms and intended occupancy rather than evaluating a parcel against a smaller hypothetical house. If you later increase the home size or change the plan, the earlier evaluation may not answer the new question. Ask the department whether the records identify a specific design flow, system type, suitable area or conditions, and what further review is needed for a construction permit.

For a proposed subdivision or multiple dwellings, ask LUGM about the land-use and subdivision process and ask SMCHD about sewage feasibility for each proposed lot and use. Do not divide total acreage by a minimum lot size and assume that creates additional legal lots. Recorded rights, zoning, access, easements, environmental constraints, water supply and sewage approvals can all affect the outcome. A Maryland real-estate attorney can review title and contract language; only the relevant County and Health Department reviews establish their respective approvals.

6. Put the Due-Diligence Questions and Deadlines in Writing

Before making an offer, list what must be confirmed, who will provide it, how access will be arranged, and when you need an answer. If current perc testing or agency review is required, allow time for the application, site preparation, field work and record review. Build the contingency and deadline with your Maryland real-estate attorney and agent. The seller may need to authorize access, and field work may be delayed by weather, site conditions, agency workload or missing documents.

If a lot’s septic feasibility is essential to your decision, do not let a general inspection contingency stand in for the specific agency review you need. Clarify whether the contract lets you terminate or renegotiate if the records or approvals are unsatisfactory, and what happens to deposits and access costs. The precise rights depend on the executed contract and law; an attorney should advise you. Your agent can coordinate dates and documents, but cannot promise a permit or interpret technical findings as the approving authority.

7. If the Lot Does Not Have Current or Usable Perc Evidence

A missing file does not automatically mean a property cannot support a system, and an old favorable result does not prove that it can. Ask SMCHD what application is appropriate, what records it can locate and whether new field work is needed. Have the proposed plan reviewed against the parcel’s actual conditions. If a test area fails or available room is constrained, ask the department what options, if any, can be considered under current requirements; do not assume an alternative system or variance will be available.

Reassess the transaction using the actual answers. The cost and schedule may change if survey work, engineering, soil evaluation, system redesign or additional agency review is needed. A lender, insurer or appraiser may have separate requirements for vacant land or a future home. Compare the property with alternatives and avoid assigning value to a future home, additional bedroom or subdivision until the relevant approvals and feasibility are documented. For an existing septic system, obtain records and inspections appropriate to the system; this article focuses on lot feasibility and new-construction perc review.

8. A Practical Buyer and Seller Checklist

For buyers: obtain the tax account number, deed, recorded plat, survey, prior perc and septic records, well records, permits, easements and any agency correspondence. Ask SMCHD whether records apply to the exact parcel and proposed use. Ask LUGM about zoning, permitted use, development rights and subdivision status. Confirm legal access and title restrictions. If the seller’s documents are incomplete, make the need for current review and access part of a written due-diligence plan before contract deadlines arrive.

For sellers: gather the complete agency file, not just a favorable page; disclose known conditions and identify which documents relate to which parcel. Do not describe a property as approved or buildable beyond what written agency records support. For both sides: identify the professionals who answer each question, share a current site plan, record responses in writing and keep enough time for review. An agent can help keep the transaction organized and connect the parcel questions to the offer schedule; the County, Health Department and licensed professionals make or support the technical and regulatory determinations.

For a buyer comparing two parcels, make a simple side-by-side file: parcel number; acreage and legal access; zoning and recorded restrictions; date and result of perc work; proposed bedroom count; well status; usable site-plan area; unresolved permits; and the agency or professional who must answer each open item. Add the response date and any stated condition. This prevents a favorable report for one parcel or one plan from being mistakenly carried over to another. It also gives your lender and attorney a clear record of what remains uncertain before the contract’s review period ends.

Bottom Line

A perc test is evidence for one part of a larger decision. Match the records to the parcel and the home you plan to build, then confirm septic feasibility, zoning, access, well, title and environmental constraints with the agencies and professionals responsible. A real-estate agent can organize the questions and schedule; only the proper authorities can confirm approvals.

Frequently Asked Questions

Possibly, but ask SMCHD whether the records are on file, match the exact parcel and proposed use, and remain usable under current requirements. An old result may not fit a changed plan or current site conditions.

Sources: St. Mary’s County Health Department: Perc Testing · St. Mary’s County Health Department: On-Site Septic Systems · Maryland Code of Regulations: COMAR 26.04.02 · St. Mary’s County GIS · St. Mary’s County Comprehensive Zoning Ordinance. Checked October 2026; maps, rules and forms can change. Confirm parcel-specific questions with the agency or professional responsible.

For broader planning, continue with my Maryland buyer guide, PCS relocation guide, seller guide, home-selling resources or home value page.

Evaluating a vacant lot?

Share the address or tax account number and your intended plans. I can help you organize the transaction questions and identify which agency records to request.

Discuss a Lot Purchase Ask Nicole a question

Free · Monthly · St. Mary's County

Get My St. Mary's County Market Update

Once a month I send what sold, what it sold for, and what it means if you're thinking about selling or buying in St. Mary's, from Lexington Park to Leonardtown to the waterfront. Short, local, and written by me.

I'm mostly interested in...

Nicole Gantt Real Estate

Deep Roots Real Estate  ·  Southern Maryland Realtor

MD License #501-7759

Equal Housing Opportunity

Stay Connected

Get Southern Maryland market updates and home selling tips in your inbox.

Call Text Home Value